Sustainability is integral to any institution of higher learning and the University’s leadership was evident by investing over $6 million to significantly reduce the coal emissions from their power plant facility. The scope of work included a three-story building addition housing a state-of-the-art baghouse and ash handling system including upgrades to the existing boiler controls to increase operating efficiencies. The addition was designed to blend in with the existing architectural theme of brick façade and slate roof throughout the campus.